640 Earthworks

Projects

Proven Projects. Real Results.

From municipal infrastructure to environmental restoration, 640 Earthworks has successfully completed projects that strengthen communities and improve public systems across Alberta.

 

Cold Lake PRV – Building 5

  • Upgraded the City of Cold Lake’s water distribution network with a modern pressure-reducing valve facility.
  • Scope included demolition, valve installation, and full commissioning.
  • Delivered reliable water pressure management and long-term operational stability.
 
s20231031_114838

Elk Point Lift Station Upgrades

  • Fully retrofitted the Town of Elk Point’s wastewater lift station with new piping, HVAC, and electrical systems.
  • Enhanced reliability and efficiency for critical wastewater infrastructure.
  • Completed in early 2022 — ensuring dependable service for years to come.
 
7

ACE Contract 24 – PRV Facilities

  • Installed 11 km of HDPE fusible pipe using trenchless technology for Lac La Biche County.
  • Expanded services to 97 properties with air releases, cleanouts, and modernized valving.
  • Delivered efficient, low-impact upgrades supporting sustainable community growth.
 
20231207_153149

Camrose County Water Pipeline

  • Installed new potable water pipelines for Ervick, Armena, and Braim communities.
  • Used horizontal directional drilling (HDD) to minimize surface disruption.
  • Added PRV vault construction and site development for reliable distribution.
19001 (2)

St. Paul Airport Lighting Upgrades

  • Modernized airfield lighting systems for St. Paul Airport.
  • Installed new electrical, HDD under-runway servicing, and screw pile foundations.
  • Delivered safe, efficient, and reliable lighting for ongoing airport operations.
 
Photo 2019-11-13, 7 17 24 AM

Plamondon Water & Sewer Extension

  • Installed new water and sanitary mains with tie-ins to existing infrastructure.
  • Integrated fire hydrants, testing, and commissioning for Lac La Biche County.
  • Enhanced community servicing through efficient HDD pipeline installation.
 
Photo 2020-01-23, 11 58 51 AM

Mission Water & Sewer – Phase 2 & 3

  • Installed approximately 11 km of HDPE fusible pipe using trenchless technology.
  • Delivered water and sewer connections for 97 residential properties.
  • Improved long-term utility servicing and system reliability.
Photo 2019-11-13, 7 17 24 AM

Bonnyville Storm Project – Birch Grove Outfall

  • Installed 105 m of 700 mm HDPE and 250 m of concrete storm pipe along Moose Lake.
  • Combined HDD and open-cut excavation for minimal impact.
  • Constructed a durable outfall providing enhanced stormwater control.
IMG_3683

Sucker Creek First Nation – Core Area & East Extension

  • Installed over 5 km of HDPE watermain and 550 m of gravity sewer.
  • Built a new fiberglass lift station with mechanical and electrical systems.
  • Partnered with local Indigenous subcontractors to build community capacity.
IMG_0884

ACE Dewberry to Clandonald Water Pipeline

  • Constructed a 15 km HDPE transmission main for the ACE Water Corporation.
  • Followed an abandoned rail corridor using HDD for multiple crossings.
  • Completed tie-ins, air release valves, and maintenance pigging systems.
Photo 2019-11-13, 7 17 24 AM

ACE Contract 20 – Facilities (Phase 7)

  • Constructed a new PRV station and upgraded Dewberry and Clandonald pump houses.
  • Completed helical pile foundations, prefabricated buildings, and access roads.
  • Delivered full mechanical, electrical, and control system installations.
Photo 2021-11-05, 5 23 16 PM

Plamondon Lift Stations

  • Built two new wastewater lift stations — an intermediate and a regional facility.
  • Installed precast concrete structures, directional drilling, and site grading.
  • Integrated chemical dosing and programming for efficient operation.
Photo 2023-10-23, 4 22 54 PM (1)

Long Lake Provincial Park – Sani-Dump & Wastewater Upgrades

  • Upgraded wastewater systems for Alberta Forestry & Parks.
  • Installed new underground utilities, concrete structures, and lighting.
  • Modernized park infrastructure for sustainable environmental management.
Photo 2024-06-05, 9 11 40 AM

Oyen – West Hospital Lift Station Upgrade

  • Replaced aging hospital lift station with a modern FRP unit.
  • Installed new structural, electrical, and concrete systems via crane lift.
  • Ensured reliable wastewater handling for hospital and nearby areas.
IMG_2968

Smith Raw Water Pumphouse Replacement

  • Constructed a new concrete pumphouse for the M.D. of Lesser Slave River.
  • Installed transfer pumps, piping, and PLC-based control systems.
  • Delivered civil, structural, and electrical upgrades to modern standards.
Photo 2024-09-15, 5 59 45 PM

Cypress Hills Provincial Park – Lift Station Replacement & Upgrades

  • Replaced and upgraded multiple wastewater lift stations across the park.
  • Installed new FRP lift stations, pumps, valves, and permanent standby generators.
  • Delivered modernized wastewater infrastructure through coordinated fieldwork.
20250716_112512

Empress – Water Reservoir & Pump Station Upgrades

  • Replaced the Village of Empress water reservoir and pumphouse.
  • Installed a new glass-fused steel tank with upgraded process piping and controls.
  • Improved water reliability and operational resilience for the community.
IMG_5473

Vermilion – Water Vault & WTP Upgrades

  • Replacing aging water meter vault and PRV manhole with modern infrastructure.
  • Supporting Vermilion’s ongoing water treatment facility improvements.
  • Enhancing efficiency and operational reliability across the local water system.
IMG_4330 (1)

Ready to Build with Confidence?

Let’s talk about your next project. Partner with 640 Earthworks for dependable civil infrastructure solutions designed to last.

 
Scroll to Top