From municipal infrastructure to environmental restoration, 640 Earthworks has successfully completed projects that strengthen communities and improve public systems across Alberta.
Cold Lake PRV – Building 5
- Upgraded the City of Cold Lake’s water distribution network with a modern pressure-reducing valve facility.
- Scope included demolition, valve installation, and full commissioning.
- Delivered reliable water pressure management and long-term operational stability.



s20231031_114838
s20231031_121351
s20231031_121413
Elk Point Lift Station Upgrades
- Fully retrofitted the Town of Elk Point’s wastewater lift station with new piping, HVAC, and electrical systems.
- Enhanced reliability and efficiency for critical wastewater infrastructure.
- Completed in early 2022 — ensuring dependable service for years to come.



7
IMG_5320
IMG_5324
ACE Contract 24 – PRV Facilities
- Installed 11 km of HDPE fusible pipe using trenchless technology for Lac La Biche County.
- Expanded services to 97 properties with air releases, cleanouts, and modernized valving.
- Delivered efficient, low-impact upgrades supporting sustainable community growth.



20231207_153149
723740917
IMG_5161
Camrose County Water Pipeline
- Installed new potable water pipelines for Ervick, Armena, and Braim communities.
- Used horizontal directional drilling (HDD) to minimize surface disruption.
- Added PRV vault construction and site development for reliable distribution.



19001 (2)
19001 (3)
20190611_154715
St. Paul Airport Lighting Upgrades
- Modernized airfield lighting systems for St. Paul Airport.
- Installed new electrical, HDD under-runway servicing, and screw pile foundations.
- Delivered safe, efficient, and reliable lighting for ongoing airport operations.

Photo 2019-11-13, 7 17 24 AM
Plamondon Water & Sewer Extension
- Installed new water and sanitary mains with tie-ins to existing infrastructure.
- Integrated fire hydrants, testing, and commissioning for Lac La Biche County.
- Enhanced community servicing through efficient HDD pipeline installation.



Photo 2020-01-23, 11 58 51 AM
Photo 2020-05-21, 6 53 16 AM
Photo 2020-05-21, 6 54 06 AM
Mission Water & Sewer – Phase 2 & 3
- Installed approximately 11 km of HDPE fusible pipe using trenchless technology.
- Delivered water and sewer connections for 97 residential properties.
- Improved long-term utility servicing and system reliability.

Photo 2019-11-13, 7 17 24 AM
Bonnyville Storm Project – Birch Grove Outfall
- Installed 105 m of 700 mm HDPE and 250 m of concrete storm pipe along Moose Lake.
- Combined HDD and open-cut excavation for minimal impact.
- Constructed a durable outfall providing enhanced stormwater control.



IMG_3683
Photo 2020-03-01, 4 17 39 PM
Photo 2020-03-01, 3 24 48 PM
Sucker Creek First Nation – Core Area & East Extension
- Installed over 5 km of HDPE watermain and 550 m of gravity sewer.
- Built a new fiberglass lift station with mechanical and electrical systems.
- Partnered with local Indigenous subcontractors to build community capacity.



IMG_0884
IMG_0883
IMG_0857
ACE Dewberry to Clandonald Water Pipeline
- Constructed a 15 km HDPE transmission main for the ACE Water Corporation.
- Followed an abandoned rail corridor using HDD for multiple crossings.
- Completed tie-ins, air release valves, and maintenance pigging systems.

Photo 2019-11-13, 7 17 24 AM
ACE Contract 20 – Facilities (Phase 7)
- Constructed a new PRV station and upgraded Dewberry and Clandonald pump houses.
- Completed helical pile foundations, prefabricated buildings, and access roads.
- Delivered full mechanical, electrical, and control system installations.



Photo 2021-11-05, 5 23 16 PM
Photo 2022-03-17, 4 55 04 PM
Photo 2022-03-17, 6 31 40 PM
Plamondon Lift Stations
- Built two new wastewater lift stations — an intermediate and a regional facility.
- Installed precast concrete structures, directional drilling, and site grading.
- Integrated chemical dosing and programming for efficient operation.



Photo 2023-05-15, 9 54 09 AM
Photo 2023-10-23, 4 22 54 PM (1)
Photo 2023-03-09, 6 28 24 PM
Long Lake Provincial Park – Sani-Dump & Wastewater Upgrades
- Upgraded wastewater systems for Alberta Forestry & Parks.
- Installed new underground utilities, concrete structures, and lighting.
- Modernized park infrastructure for sustainable environmental management.



Photo 2024-06-05, 9 11 40 AM
Photo 2024-06-05, 9 15 16 AM
Photo 2024-06-05, 9 24 28 AM
Oyen – West Hospital Lift Station Upgrade
- Replaced aging hospital lift station with a modern FRP unit.
- Installed new structural, electrical, and concrete systems via crane lift.
- Ensured reliable wastewater handling for hospital and nearby areas.



IMG_2968
IMG_3238
IMG_3247
Smith Raw Water Pumphouse Replacement
- Constructed a new concrete pumphouse for the M.D. of Lesser Slave River.
- Installed transfer pumps, piping, and PLC-based control systems.
- Delivered civil, structural, and electrical upgrades to modern standards.



Photo 2024-09-15, 5 59 45 PM
Photo 2024-09-15, 7 51 02 PM
Photo 2025-06-09, 1 45 28 PM
Cypress Hills Provincial Park – Lift Station Replacement & Upgrades
- Replaced and upgraded multiple wastewater lift stations across the park.
- Installed new FRP lift stations, pumps, valves, and permanent standby generators.
- Delivered modernized wastewater infrastructure through coordinated fieldwork.


20250716_112512
Photo 2025-04-11, 9 01 30 AM
Empress – Water Reservoir & Pump Station Upgrades
- Replaced the Village of Empress water reservoir and pumphouse.
- Installed a new glass-fused steel tank with upgraded process piping and controls.
- Improved water reliability and operational resilience for the community.


IMG_5473
IMG_5280
Vermilion – Water Vault & WTP Upgrades
- Replacing aging water meter vault and PRV manhole with modern infrastructure.
- Supporting Vermilion’s ongoing water treatment facility improvements.
- Enhancing efficiency and operational reliability across the local water system.